Stop Wasting Time and Money in Field Welding Operations

Industry data coupled with my time spent at construction sites tells us that welding operators are typically taking four trips back to the power source to adjust either their processes or their parameters. The bead strip, lasting upwards of 15 minutes, that’s costing you $11,250 on the job site. By using our ArcReach technology, which […]

Downhill Welding Tips: Setting Arc Control vs. DIG Range

Warning, read and follow all labels and the owner’s manual. Dynamic DIG is our version of our dig control. We developed Dynamic DIG specifically for pipe welders, downhill pipe welders. It gives pipe welders an optimum arc that allows them to adjust parameters to allow them to make X-ray quality welds every time. All right […]