Stop Wasting Time and Money in Field Welding Operations

Industry data coupled with my time spent at construction sites tells us that welding operators are typically taking four trips back to the power source to adjust either their processes or their parameters. The bead strip, lasting upwards of 15 minutes, that’s costing you $11,250 on the job site. By using our ArcReach technology, which […]

M&M Welding Saves Time and Money With ArcReach Technology

I’m Mark Upshaw, and about five years ago my wife and I started M&M Welding. We do work all over the state of California. We do a lot of different types of welding here. Primarily we’re mobile welding. Our customers need high-quality welds — critical welds — but they also need the job done quick […]

Apex Steel Saves Time with Miller ArcReach Welding Technology

Hi my name is Jim Green, I’m the general superintendent for Apex Steel and Apex Tower Crane. We’re structural steel contractor, we specialize in steel erection, architectural iron, and we also have a tower crane and man lift division. Our customers really demand quality and they’ve come to expect the quality that Apex puts out […]

California Welding Operation Relies on ArcReach Technology

There’s generally multiple contractors. So there’s leads, extension cords, the scaffolding, that you have to wade through and climb down the staircases and ladders to get back to the power source or your engine-drive. With ArcReach it alleviates a lot of safety issues. You’ve got full control of your engine-drive right at your fingertips.